United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AC1-210, Madison County
Solar project AC1-210, Madison County is a 45.0 MW solar request withdrawn in the PJM interconnection queue, in Madison County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2016 (completed)
- Withdrawn / abandonedJul 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC1-210
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Madison 69kV
- Location
- Madison County, Ohio
- Technology
- Solar: 45.0 MW
- Total requested
- 45.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 October 2016
- Proposed online date
- June 2018
- Withdrawn
- July 2018
Location
Marker shows the centre of Madison County; the queue data does not give exact sites.
Other requests in Madison County
- Oak Run Solar ProjectSolar Β· 400 MW Β· agreement signed
- Oak Run Solar ProjectSolar Β· 400 MW Β· agreement signed
- Springwater SolarSolar Β· 155 MW Β· agreement signed
- Solar project AG2-104, Madison CountySolar Β· 200 MW Β· in study
- Solar project AH2-168, Madison CountySolar Β· 185 MW Β· in study
- Solar project AI2-328, Madison CountySolar Β· 100 MW Β· in study
- Solar project AI2-329, Madison CountySolar Β· 100 MW Β· in study
- Solar project AI2-330, Madison CountySolar Β· 83.5 MW Β· in study
- Solar project AI2-337, Madison CountySolar Β· 30.0 MW Β· in study
- Fox Squirrel SolarSolar Β· 577 MW Β· built
- Madison Fields Solar ProjectSolar Β· 180 MW Β· built
- Big PlainSolar Β· 176 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem