United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

ONSHORE WIND Β· SPP

Onshore wind project GEN-2013-034, Ellis County

Onshore wind project GEN-2013-034, Ellis County is a 73.6 MW onshore wind request withdrawn in the SPP interconnection queue, in Ellis County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2013 (completed)
  2. Withdrawn / abandonedAug 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2013-034
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Tap Hitchland - Woodward Dbl Ckt (GEN-2013-034 Tap) 345kV
Location
Ellis County, Oklahoma
Technology
Wind: 73.6 MW
Total requested
73.6 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
30 September 2013
Proposed online date
December 2014
Withdrawn
August 2014

Location

Marker shows the centre of Ellis County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Ellis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem