πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

SOLAR Β· PJM

Solar project AH1-458, Hampshire County

Solar project AH1-458, Hampshire County is a 100 MW solar request withdrawn in the PJM interconnection queue, in Hampshire County, West Virginia, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-458
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Hampshire - Ridgeley 138 kV 1
Location
Hampshire County, West Virginia
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
December 2024
Withdrawn
December 2024

Location

Marker shows the centre of Hampshire County; the queue data does not give exact sites.

Power plants in West Virginia Β· Transmission lines in West Virginia

Other requests in Hampshire County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem