United States β€Ί Grid β€Ί Interconnection queues β€Ί Kansas

BATTERY STORAGE Β· SPP

Battery storage project GEN-2018-093, Sedgwick County

Battery storage project GEN-2018-093, Sedgwick County is a 60.0 MW battery storage request withdrawn in the SPP interconnection queue, in Sedgwick County, Kansas, connecting to WERE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2018-093
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WERE
Connection point (POI)
Gordan Evans 138kV Substation
Location
Sedgwick County, Kansas
Technology
Battery: 60.0 MW
Total requested
60.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
21 November 2018
Proposed online date
December 2027
Withdrawn
September 2023

Location

Marker shows the centre of Sedgwick County; the queue data does not give exact sites.

Power plants in Kansas Β· Transmission lines in Kansas

Other requests in Sedgwick County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem