Other project 390, Beaver County

Other project 390, Beaver County is a 0.4 MW other request withdrawn in the West interconnection queue, in Beaver County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
390
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
circuit, SML21, out of South Milford substation
Location
Beaver County, Utah
Technology
Other: 0.4 MW
Total requested
0.4 MW
Service type
Network resource (NRIS)
Study phase
Rolled into Q0333
Queue status
Withdrawn
Entered queue
23 May 2011
Proposed online date
October 2011

Location

Marker shows the centre of Beaver County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Beaver County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem