πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

SOLAR + STORAGE Β· WEST

Solar + storage project 22-04202, Larimer County

Solar + storage project 22-04202, Larimer County is a 125 MW solar + storage request withdrawn in the West interconnection queue, in Larimer County, Colorado, connecting to Platte River Power Authority.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22-04202
Grid region
West (non-ISO utilities)
Utility / transmission owner
Platte River Power Authority
Connection point (POI)
Rawhide 230kV
Location
Larimer County, Colorado
Technology
Solar: 125 MW Β· Battery
Total requested
125 MW
Queue status
Withdrawn
Entered queue
20 April 2022
Proposed online date
June 2025

Location

Marker shows the centre of Larimer County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Larimer County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem