SOLAR Β· MISO

Solar project J3478, Vigo County

Solar project J3478, Vigo County is a 35.0 MW solar request withdrawn in the MISO interconnection queue, in Vigo County, Indiana, connecting to HOOSIER ENERGY.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedJul 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3478
Grid region
MISO (Midcontinent)
Utility / transmission owner
HOOSIER ENERGY
Connection point (POI)
Other_
Location
Vigo County, Indiana
Technology
Solar: 35.0 MW
Total requested
35.0 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
17 April 2024
Proposed online date
October 2027
Withdrawn
July 2025

Location

Marker shows the centre of Vigo County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Vigo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem