United States βΊ Grid βΊ Interconnection queues βΊ Louisiana
SOLAR + STORAGE Β· MISOSolar + storage project J2882, Beauregard Parish County
Solar + storage project J2882, Beauregard Parish County is a 410 MW solar + storage request withdrawn in the MISO interconnection queue, in Beauregard Parish County, Louisiana, connecting to CLECO POWER.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2882
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- CLECO POWER
- Connection point (POI)
- Cooper-Penton Road 230kV
- Location
- Beauregard Parish County, Louisiana
- Technology
- Solar: 410 MW Β· Battery
- Total requested
- 410 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- September 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Beauregard Parish County; the queue data does not give exact sites.
Power plants in Louisiana Β· Transmission lines in Louisiana
Other requests in Beauregard Parish County
- Solar project J1424, Beauregard Parish CountySolar Β· 200 MW Β· under construction
- Solar project J3939, Beauregard Parish CountySolar Β· 386 MW Β· in study
- Solar + storage project J4201, Beauregard Parish CountySolar + storage Β· 250 MW Β· in study
- Solar project J4092, Beauregard Parish CountySolar Β· 200 MW Β· in study
- Battery storage project S1123, Beauregard Parish CountyBattery storage Β· 200 MW Β· in study
- Solar project J4188, Beauregard Parish CountySolar Β· 140 MW Β· in study
- Solar + storage project J2911, Beauregard Parish CountySolar + storage Β· 810 MW Β· withdrawn
- Solar project J2310, Beauregard Parish CountySolar Β· 300 MW Β· withdrawn
- Solar + storage project J2884, Beauregard Parish CountySolar + storage Β· 276 MW Β· withdrawn
- Solar + storage project J2020, Beauregard Parish CountySolar + storage Β· 260 MW Β· withdrawn
- Solar project J2505, Beauregard Parish CountySolar Β· 250 MW Β· withdrawn
- Solar project J2441, Beauregard Parish CountySolar Β· 250 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem