United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· WEST

EPE Gen - Caliente

EPE Gen - Caliente is a 348 MW gas request withdrawn in the West interconnection queue, in El Paso County, Texas, connecting to El Paso Electric Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
36
Grid region
West (non-ISO utilities)
Utility / transmission owner
El Paso Electric Company
Connection point (POI)
Socorro, Texas
Location
El Paso County, Texas
Technology
Gas: 348 MW
Total requested
348 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
16 February 2011
Proposed online date
May 2015

Location

Marker shows the centre of El Paso County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in El Paso County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem