ONSHORE WIND Β· MISO

Onshore wind project H059, Nobles County

Onshore wind project H059, Nobles County is a 40.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Nobles County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2008 (completed)
  2. Withdrawn / abandonedJun 2012 (project stopped here)
  3. ConsentedJun 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H059
Grid region
MISO (Midcontinent)
Connection point (POI)
69kV 3 way switch at the Worthington, 2.5 miles South of Elk substation
Location
Nobles County, Minnesota
Technology
Wind: 40.0 MW
Total requested
40.0 MW
Study phase
DPP - SIS
Queue status
Withdrawn
Entered queue
12 June 2008
Agreement signed
26 June 2012
Proposed online date
December 2011
Withdrawn
June 2012

Location

Marker shows the centre of Nobles County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Nobles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem