πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· MISO

Onshore wind project J489, Grant County

Onshore wind project J489, Grant County is a 152 MW onshore wind request withdrawn in the MISO interconnection queue, in Grant County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2015 (completed)
  2. Withdrawn / abandonedMar 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J489
Grid region
MISO (Midcontinent)
Connection point (POI)
345 kV at new Tap on proposed MVP Big Stone to Ellendale line
Location
Grant County, South Dakota
Technology
Wind: 152 MW
Total requested
152 MW
Study phase
GIA
Queue status
Withdrawn
Entered queue
11 November 2015
Proposed online date
September 2018
Withdrawn
March 2018

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem