ONSHORE WIND Β· WEST

Onshore wind project G0251, Klickitat County

Onshore wind project G0251, Klickitat County is a 700 MW onshore wind request withdrawn in the West interconnection queue, in Klickitat County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0251
Grid region
West (non-ISO utilities)
Connection point (POI)
New substation on BPA's 500 kV McNary-John Day line
Location
Klickitat County, Washington
Technology
Wind: 700 MW
Total requested
700 MW
Service type
Energy only (ERIS)
Study phase
Facility Study
Queue status
Withdrawn
Entered queue
14 December 2006
Proposed online date
September 2010

Location

Marker shows the centre of Klickitat County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Klickitat County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem