United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Blue Cut Solar

Blue Cut Solar is a 150 MW solar request withdrawn in the ERCOT interconnection queue, in Lampasas County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2019 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0254
Grid region
ERCOT (Texas)
Developer
Blue Cut Solar, LLC
Connection point (POI)
tap 138kV 7064 Lampasas - 260 Kempner
Location
Lampasas County, Texas
Technology
Solar: 150 MW
Total requested
150 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
29 January 2019
Proposed online date
November 2025
Withdrawn
December 2024

Location

Marker shows the centre of Lampasas County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Lampasas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem