United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

SOLAR Β· PJM

Solar project AI1-073, Franklin County

Solar project AI1-073, Franklin County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Franklin County, Pennsylvania, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2022 (completed)
  2. Withdrawn / abandonedSep 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AI1-073
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Bear Peak Antrim 34.5 kV
Location
Franklin County, Pennsylvania
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
30 June 2022
Proposed online date
June 2027
Withdrawn
September 2023

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.