United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

BATTERY STORAGE Β· SPP

Battery storage project GEN-2022-SR1, Burke County

Battery storage project GEN-2022-SR1, Burke County is a 104 MW battery storage request withdrawn in the SPP interconnection queue, in Burke County, North Dakota, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2022 (completed)
  2. Withdrawn / abandonedNov 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2022-SR1
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
Tande 345 kV Substation
Location
Burke County, North Dakota
Technology
Battery: 104 MW
Total requested
104 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
2 March 2022
Proposed online date
November 2022
Withdrawn
November 2022

Location

Marker shows the centre of Burke County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Burke County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem