United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
BATTERY STORAGE Β· SPPBattery storage project GEN-2022-SR1, Burke County
Battery storage project GEN-2022-SR1, Burke County is a 104 MW battery storage request withdrawn in the SPP interconnection queue, in Burke County, North Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedNov 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-SR1
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Tande 345 kV Substation
- Location
- Burke County, North Dakota
- Technology
- Battery: 104 MW
- Total requested
- 104 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 March 2022
- Proposed online date
- November 2022
- Withdrawn
- November 2022
Location
Marker shows the centre of Burke County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Burke County
- Battery storage project GEN-2023-SR4, Burke CountyBattery storage Β· 170 MW Β· agreement signed
- Gas project GI-1103, Burke CountyGas Β· 0.8 MW Β· agreement signed
- Onshore wind project GEN-2016-151, Burke CountyOnshore wind Β· 202 MW Β· built
- Gas project GI-1009, Burke CountyGas Β· 0.3 MW Β· built
- Onshore wind project GEN-2016-152, Burke CountyOnshore wind Β· 102 MW Β· withdrawn
- Gas project GI-1010, Burke CountyGas Β· 0.8 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem