SOLAR Β· PJMBeech Hollow Solar
Beech Hollow Solar is a 215 MW solar request withdrawn in the PJM interconnection queue, in Allegheny County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-527
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Imperial-Joffre 138 kV
- Location
- Allegheny County, Pennsylvania
- Technology
- Solar: 215 MW
- Total requested
- 215 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 30 September 2020
- Proposed online date
- July 2028
- Withdrawn
- January 2025
Location
Marker shows the centre of Allegheny County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Allegheny County
- Battery storage project AH2-244, Allegheny CountyBattery storage Β· 25.0 MW Β· in study
- Battery storage project AH2-245, Allegheny CountyBattery storage Β· 25.0 MW Β· in study
- Solar project AG2-037, Allegheny CountySolar Β· 4.7 MW Β· in study
- Springdale CT3, CT4, ST5Gas Β· 525 MW Β· built
- Springdale 1 & 2Gas Β· 96.0 MW Β· built
- SpringdaleGas Β· 50.4 MW Β· built
- Pittsburgh International AirportGas Β· 14.4 MW Β· built
- AES Warrior Run Energy StorageBattery storage Β· 11.0 MW Β· built
- Luke PaperCoal Β· 8.0 MW Β· built
- Coal project V1-013, Allegheny CountyCoal Β· 580 MW Β· withdrawn
- Allegheny Energy Center LLCGas Β· 541 MW Β· withdrawn
- Gas project G06_W47, Allegheny CountyGas Β· 500 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem