United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISOJerry Smith Energy Storage
Jerry Smith Energy Storage is a 34.9 MW battery storage request withdrawn in the NYISO interconnection queue, in Tompkins County, New York, connecting to NYSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-247
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NYSEG
- Developer
- Nexamp Solar LLC
- Connection point (POI)
- Milliken to Ludlowville 34.5kV Line #522
- Location
- Tompkins County, New York
- Technology
- Battery: 34.9 MW
- Total requested
- 34.9 MW
- Queue status
- Withdrawn
- Entered queue
- 23 September 2024
Location
Marker shows the centre of Tompkins County; the queue data does not give exact sites.
Other requests in Tompkins County
- BPP NY Lansing BESS IBattery storage · 200 MW · in study
- Yellow Barn SolarSolar · 160 MW · in study
- Cayuga SolarSolar · 60.0 MW · in study
- Troy Heights Energy StorageBattery storage · 40.0 MW · in study
- Cayuga SolarSolar · 207 MW · withdrawn
- BPP NY Lansing BESS IBattery storage · 200 MW · withdrawn
- Yellow Barn SolarSolar · 160 MW · withdrawn
- Silverline Energy CenterSolar + storage · 150 MW · withdrawn
- Argos SolarSolar · 150 MW · withdrawn
- Silverline Energy CenterSolar + storage · 150 MW · withdrawn
- Queen Energy CenterBattery storage · 140 MW · withdrawn
- Cayuga SolarSolar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem