🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Illinois

BATTERY STORAGE · PJM

Blooming Grove Solar Energy Center

Blooming Grove Solar Energy Center is a 50.0 MW battery storage request withdrawn in the PJM interconnection queue, in Mclean County, Illinois, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2019 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AE2-173
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Developer
Blooming Grove Solar Energy Center LLC
Connection point (POI)
McLean 345 kV
Location
Mclean County, Illinois
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Withdrawn
Entered queue
18 March 2019
Proposed online date
December 2022
Withdrawn
November 2025

Location

Marker shows the centre of Mclean County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Mclean County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem