United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR Β· WESTSolar project 820, Beaver County
Solar project 820, Beaver County is a 48.0 MW solar request withdrawn in the West interconnection queue, in Beaver County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedSep 2022 (project stopped here)
- ConsentedNov 2019 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 820
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Developer
- Grass Butte Solar, LLC
- Connection point (POI)
- South Milford substation
- Location
- Beaver County, Utah
- Technology
- Solar: 48.0 MW
- Total requested
- 48.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA Executed 11/7/19, Suspended 3/20/2020, IA terminated 9/2/2022
- Queue status
- Withdrawn
- Entered queue
- 15 November 2016
- Agreement signed
- 7 November 2019
- Proposed online date
- February 2018
- Withdrawn
- September 2022
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Other requests in Beaver County
- Solar project 634, Beaver CountySolar Β· 99.0 MW Β· agreement signed
- Battery storage project S0008, Beaver CountyBattery storage Β· 80.0 MW Β· agreement signed
- Battery storage project S0007, Beaver CountyBattery storage Β· 80.0 MW Β· agreement signed
- Battery storage project S0009, Beaver CountyBattery storage Β· 80.0 MW Β· agreement signed
- Geothermal project T2-012, Beaver CountyGeothermal Β· 3.6 MW Β· in study
- Solar project 631, Beaver CountySolar Β· 99.0 MW Β· built
- Solar project 551, Beaver CountySolar Β· 80.0 MW Β· built
- Solar project 515, Beaver CountySolar Β· 80.0 MW Β· built
- Solar project 516, Beaver CountySolar Β· 80.0 MW Β· built
- Geothermal project 313, Beaver CountyGeothermal Β· 25.0 MW Β· built
- Geothermal project 66, Beaver CountyGeothermal Β· 15.0 MW Β· built
- Geothermal project 415, Beaver CountyGeothermal Β· 11.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem