United States › Grid › Interconnection queues › New York
SOLAR + STORAGE · NYISOWesterlo Solar
Westerlo Solar is a 40.0 MW solar + storage request withdrawn in the NYISO interconnection queue, in Albany County, New York, connecting to CHGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C24-095
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHGE
- Developer
- Westerlo Solar LLC
- Connection point (POI)
- Westerlo-New Baltimore 69kV Line #NW
- Location
- Albany County, New York
- Technology
- Solar: 40.0 MW · Battery
- Total requested
- 40.0 MW
- Queue status
- Withdrawn
- Entered queue
- 23 August 2024
Location
Marker shows the centre of Albany County; the queue data does not give exact sites.
Other requests in Albany County
- Elevate BethlehemBattery storage · 120 MW · in study
- Bethlehem Energy CenterGas · 350 MW · built
- Bethlehem Energy CenterGas · 350 MW · built
- Bethlehem Energy Center UprateGas · 72.0 MW · built
- Bethlehem Energy Center UprateGas · 72.0 MW · built
- Albany County 2Solar · 20.0 MW · built
- Albany County 1Solar · 20.0 MW · built
- Albany County 2Solar · 20.0 MW · built
- Albany County 1Solar · 20.0 MW · built
- Albany LandfillOther · 6.4 MW · built
- Albany LandfillOther · 6.4 MW · built
- MM Albany LandfillOther · 4.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem