GAS Β· WESTGNA Energy
GNA Energy is a 100 MW gas request withdrawn in the West interconnection queue, in Klickitat County, Washington, connecting to GNA Energy, LLC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G71-01
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- GNA Energy, LLC
- Developer
- GNA Energy, LLC
- Connection point (POI)
- BPA's Harvalum 230 kV Substation in Goldendal WA.
- Location
- Klickitat County, Washington
- Technology
- Gas: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 20 August 2001
- Proposed online date
- January 2003
Location
Marker shows the centre of Klickitat County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Klickitat County
- Battery storage project G0608, Klickitat CountyBattery storage Β· 1,200 MW Β· in study
- Solar + storage project G0844, Klickitat CountySolar + storage Β· 420 MW Β· in study
- Solar + storage project G0979, Klickitat CountySolar + storage Β· 400 MW Β· in study
- Solar project G1016, Klickitat CountySolar Β· 400 MW Β· in study
- Solar project G0589, Klickitat CountySolar Β· 381 MW Β· in study
- Onshore wind project G0585, Klickitat CountyOnshore wind Β· 313 MW Β· in study
- Solar project G1031, Klickitat CountySolar Β· 250 MW Β· in study
- Solar + storage project G0676, Klickitat CountySolar + storage Β· 250 MW Β· in study
- Solar + storage project G0598, Klickitat CountySolar + storage Β· 223 MW Β· in study
- Solar project G0645, Klickitat CountySolar Β· 200 MW Β· in study
- Battery storage project G0637, Klickitat CountyBattery storage Β· 190 MW Β· in study
- Solar + storage project G0843, Klickitat CountySolar + storage Β· 180 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem