United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J849, Delta County
Solar project J849, Delta County is a 125 MW solar request withdrawn in the MISO interconnection queue, in Delta County, Michigan, connecting to American Transmission Co..
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedApr 2022 (project stopped here)
- ConsentedJun 2019 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J849
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- American Transmission Co.
- Connection point (POI)
- Chandler 138 kV Substation
- Location
- Delta County, Michigan
- Technology
- Solar: 125 MW
- Total requested
- 125 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Agreement signed
- 26 June 2019
- Proposed online date
- April 2022
- Withdrawn
- April 2022
Location
Marker shows the centre of Delta County; the queue data does not give exact sites.
Other requests in Delta County
- Solar project J2678, Delta CountySolar Β· 150 MW Β· in study
- Surplus; J928Other Β· 55.0 MW Β· in study
- Onshore wind project J928, Delta CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project J060, Delta CountyOnshore wind Β· 29.0 MW Β· built
- Solar project J1183, Delta CountySolar Β· 1.4 MW Β· built
- Solar project J557, Delta CountySolar Β· 0.9 MW Β· built
- Onshore wind project G937, Delta CountyOnshore wind Β· 200 MW Β· withdrawn
- Coal project G567, Delta CountyCoal Β· 165 MW Β· withdrawn
- Coal project G568, Delta CountyCoal Β· 135 MW Β· withdrawn
- Onshore wind project J061, Delta CountyOnshore wind Β· 70.0 MW Β· withdrawn
- Other project J039, Delta CountyOther Β· 50.0 MW Β· withdrawn
- Onshore wind project J592, Delta CountyOnshore wind Β· 48.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem