United States βΊ Grid βΊ Interconnection queues βΊ Michigan
ONSHORE WIND Β· MISOOnshore wind project G937, Delta County
Onshore wind project G937, Delta County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Delta County, Michigan.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2007 (completed)
- Withdrawn / abandonedJul 2009 (project stopped here)
- ConsentedJul 2009 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G937
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Indian Lake - Perkins 138kV
- Location
- Delta County, Michigan
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 20 December 2007
- Agreement signed
- 7 July 2009
- Proposed online date
- October 2010
- Withdrawn
- July 2009
Location
Marker shows the centre of Delta County; the queue data does not give exact sites.
Other requests in Delta County
- Solar project J2678, Delta CountySolar Β· 150 MW Β· in study
- Surplus; J928Other Β· 55.0 MW Β· in study
- Onshore wind project J928, Delta CountyOnshore wind Β· 80.0 MW Β· built
- Onshore wind project J060, Delta CountyOnshore wind Β· 29.0 MW Β· built
- Solar project J1183, Delta CountySolar Β· 1.4 MW Β· built
- Solar project J557, Delta CountySolar Β· 0.9 MW Β· built
- Coal project G567, Delta CountyCoal Β· 165 MW Β· withdrawn
- Coal project G568, Delta CountyCoal Β· 135 MW Β· withdrawn
- Solar project J849, Delta CountySolar Β· 125 MW Β· withdrawn
- Onshore wind project J061, Delta CountyOnshore wind Β· 70.0 MW Β· withdrawn
- Other project J039, Delta CountyOther Β· 50.0 MW Β· withdrawn
- Onshore wind project J592, Delta CountyOnshore wind Β· 48.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem