United States βΊ Grid βΊ Interconnection queues βΊ Illinois
BATTERY STORAGE Β· PJMBattery storage project AA1-116, Kankakee County
Battery storage project AA1-116, Kankakee County is a 18.4 MW battery storage request withdrawn in the PJM interconnection queue, in Kankakee County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2014 (completed)
- Withdrawn / abandonedOct 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA1-116
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Kensington/Kankakee
- Location
- Kankakee County, Illinois
- Technology
- Battery: 18.4 MW
- Total requested
- 18.4 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Interim Study
- Queue status
- Withdrawn
- Entered queue
- 31 October 2014
- Proposed online date
- June 2016
- Withdrawn
- October 2018
Location
Marker shows the centre of Kankakee County; the queue data does not give exact sites.
Other requests in Kankakee County
- Heritage Prairie WindOnshore wind Β· 850 MW Β· agreement signed
- Heritage Prairie SolarSolar Β· 150 MW Β· agreement signed
- Heritage Prairie SolarSolar Β· 150 MW Β· agreement signed
- Staley SolarSolar Β· 50.0 MW Β· agreement signed
- Staley SolarSolar Β· 20.0 MW Β· agreement signed
- Solar + storage project AH2-363, Kankakee CountySolar + storage Β· 200 MW Β· in study
- Solar project AI1-148, Kankakee CountySolar Β· 164 MW Β· in study
- Kankakee SolarSolar Β· 144 MW Β· in study
- Grand Marsh SolarSolar Β· 100 MW Β· in study
- Solar project AG2-585, Kankakee CountySolar Β· 55.0 MW Β· in study
- Solar project AI2-014, Kankakee CountySolar Β· 37.9 MW Β· in study
- Lower Crossing WindOnshore wind Β· 200 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem