Gas project GEN-2010-046, Hale County

Gas project GEN-2010-046, Hale County is a 56.0 MW gas request withdrawn in the SPP interconnection queue, in Hale County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2010 (completed)
  2. Withdrawn / abandonedJun 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingJun 2016 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2010-046
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
TUCO 230kV
Location
Hale County, Texas
Technology
Gas: 56.0 MW
Total requested
56.0 MW
Service type
Energy only (ERIS)
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
30 September 2010
Proposed online date
June 2016
Came online
June 2016
Withdrawn
June 2019

Location

Marker shows the centre of Hale County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hale County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem