BATTERY STORAGE Β· PJMBattery storage project Y2-084, Tippecanoe County
Battery storage project Y2-084, Tippecanoe County is a 64.0 MW battery storage request withdrawn in the PJM interconnection queue, in Tippecanoe County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2012 (completed)
- Withdrawn / abandonedMar 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Y2-084
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Dequine 345kV
- Location
- Tippecanoe County, Indiana
- Technology
- Battery: 64.0 MW
- Total requested
- 64.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 30 October 2012
- Proposed online date
- February 2014
- Withdrawn
- March 2014
Location
Marker shows the centre of Tippecanoe County; the queue data does not give exact sites.
Other requests in Tippecanoe County
- Rainbow TroutSolar + storage Β· 120 MW Β· agreement signed
- Onshore wind project J2509, Tippecanoe CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J2450, Tippecanoe CountyBattery storage Β· 100 MW Β· in study
- Onshore wind project J028, Tippecanoe CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project J2060, Tippecanoe CountySolar Β· 170 MW Β· withdrawn
- Onshore wind project H026, Tippecanoe CountyOnshore wind Β· 150 MW Β· withdrawn
- Onshore wind project J163, Tippecanoe CountyOnshore wind Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem