United States βΊ Grid βΊ Interconnection queues βΊ Illinois
BATTERY STORAGE Β· MISOBattery storage project J1197, Lasalle County
Battery storage project J1197, Lasalle County is a 75.0 MW battery storage request withdrawn in the MISO interconnection queue, in Lasalle County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedAug 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1197
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Corbin 138kV Substation
- Location
- Lasalle County, Illinois
- Technology
- Battery: 75.0 MW
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 25 April 2019
- Proposed online date
- June 2021
- Withdrawn
- August 2021
Location
Marker shows the centre of Lasalle County; the queue data does not give exact sites.
Other requests in Lasalle County
- Osagrove Flats WindOnshore wind Β· 150 MW Β· agreement signed
- Nuclear project AH1-714, Lasalle CountyNuclear Β· 174 MW Β· in study
- Osagrove Flats SolarSolar Β· 150 MW Β· in study
- Otter Creek SolarSolar Β· 150 MW Β· in study
- Battery storage project AG2-061, Lasalle CountyBattery storage Β· 50.0 MW Β· in study
- Top Crop Generating FacilityBattery storage Β· 50.0 MW Β· in study
- Top Crop Generating FacilityBattery storage Β· 50.0 MW Β· in study
- Grand Ridge WFOnshore wind Β· 191 MW Β· built
- Grand Ridge Energy LLCOnshore wind Β· 150 MW Β· built
- LaSalle Nuclear Station Unit 1Nuclear Β· 20.0 MW Β· built
- LaSalle Nuclear Station Unit 2Nuclear Β· 20.0 MW Β· built
- Grand Ridge Battery StorageBattery storage Β· 4.5 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem