United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
SOLAR Β· SPPSolar project GEN-2022-174, Buffalo County
Solar project GEN-2022-174, Buffalo County is a 370 MW solar request withdrawn in the SPP interconnection queue, in Buffalo County, South Dakota, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedNov 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-174
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Fort Thompson 345 kV Substation
- Location
- Buffalo County, South Dakota
- Technology
- Solar: 370 MW
- Total requested
- 370 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 February 2023
- Proposed online date
- December 2026
- Withdrawn
- November 2023
Location
Marker shows the centre of Buffalo County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Buffalo County
- Onshore wind project GI-0209, Buffalo CountyOnshore wind Β· 40.0 MW Β· built
- Onshore wind project GI-0609, Buffalo CountyOnshore wind Β· 1,500 MW Β· withdrawn
- Onshore wind project GI-0824, Buffalo CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GI-0002, Buffalo CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project GI-0501, Buffalo CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project GI-0121, Buffalo CountyOnshore wind Β· 30.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem