ONSHORE WIND · WESTOnshore wind project GI-0209, Buffalo County
Onshore wind project GI-0209, Buffalo County is a 40.0 MW onshore wind request built and operating in the West interconnection queue, in Buffalo County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Request details
- Queue ID
- GI-0209
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Ft Thompson 69kV [Hyde 69kV]
- Location
- Buffalo County, South Dakota
- Technology
- Wind: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- IAE/IS
- Queue status
- Operational
- Entered queue
- 20 June 2002
Location
Marker shows the centre of Buffalo County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Buffalo County
- Onshore wind project GI-0609, Buffalo CountyOnshore wind · 1,500 MW · withdrawn
- Onshore wind project GI-0824, Buffalo CountyOnshore wind · 400 MW · withdrawn
- Solar project GEN-2022-174, Buffalo CountySolar · 370 MW · withdrawn
- Onshore wind project GI-0002, Buffalo CountyOnshore wind · 250 MW · withdrawn
- Onshore wind project GI-0501, Buffalo CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project GI-0121, Buffalo CountyOnshore wind · 30.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem