United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
OTHER Β· PJMIntelliWatt
IntelliWatt is a 12.5 MW other request withdrawn in the PJM interconnection queue, in Northumberland County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2007 (completed)
- Withdrawn / abandonedFeb 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- S41
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Eldred-Reed 69kV
- Location
- Northumberland County, Pennsylvania
- Technology
- Other: 12.5 MW
- Total requested
- 12.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Withdrawn
- Entered queue
- 10 May 2007
- Proposed online date
- December 2012
- Withdrawn
- February 2012
Location
Marker shows the centre of Northumberland County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Northumberland County
- Shamrock Energy CenterSolar Β· 20.0 MW Β· agreement signed
- Boyles Run SolarSolar Β· 15.9 MW Β· agreement signed
- Boyles Run SolarSolar Β· 15.9 MW Β· agreement signed
- Norwegian SolarSolar Β· 19.8 MW Β· suspended
- Northumberland SolarSolar Β· 65.0 MW Β· built
- Cottontail Solar 4 aka East Chilli SolarSolar Β· 20.0 MW Β· built
- Pine Hurst AcresOther Β· 0.0 MW Β· built
- Coal project R26, Northumberland CountyCoal Β· 940 MW Β· withdrawn
- Solar project AG2-430, Northumberland CountySolar Β· 60.0 MW Β· withdrawn
- Solar project AE1-127, Northumberland CountySolar Β· 50.0 MW Β· withdrawn
- Battery storage project AG1-050, Northumberland CountyBattery storage Β· 20.0 MW Β· withdrawn
- Solar project AH1-407, Northumberland CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem