Gas project GEN-2008-135, Ector County

Gas project GEN-2008-135, Ector County is a 531 MW gas request withdrawn in the SPP interconnection queue, in Ector County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2008-135
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Location
Ector County, Texas
Technology
Gas: 531 MW
Total requested
531 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 December 2008
Proposed online date
January 2012

Location

Marker shows the centre of Ector County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ector County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem