United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISORavenswood Energy Storage
Ravenswood Energy Storage is a 187 MW battery storage request withdrawn in the NYISO interconnection queue, in Queens County, New York, connecting to ConEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2018 (completed)
- Withdrawn / abandonedDec 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 786
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- Ravenswood Development, LLC
- Connection point (POI)
- Rainey - Farragut 345kV
- Location
- Queens County, New York
- Technology
- Battery: 187 MW
- Total requested
- 187 MW
- Queue status
- Withdrawn
- Entered queue
- 20 December 2018
- Withdrawn
- December 2021
Location
Marker shows the centre of Queens County; the queue data does not give exact sites.
Other requests in Queens County
- Astoria Energy StorageBattery storage · 100 MW · in study
- Harlem River YardBattery storage · 79.9 MW · in study
- Luyster Creek Energy Storage 2Battery storage · 79.0 MW · in study
- Luyster Creek Energy Storage 1Battery storage · 57.3 MW · in study
- Luyster Creek Energy Storage 3Battery storage · 15.0 MW · in study
- Astoria Energy IIGas · 617 MW · built
- Astoria Energy IIGas · 617 MW · built
- Poletti ExpansionGas · 500 MW · built
- Astoria Energy - Phase 1Gas · 500 MW · built
- Astoria Energy - Phase 1Gas · 500 MW · built
- Poletti ExpansionGas · 500 MW · built
- OW Ocean Winds East 5Offshore wind · 1,600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem