πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

ONSHORE WIND Β· MISO

Onshore wind project G537, Iroquois County

Onshore wind project G537, Iroquois County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Iroquois County, Illinois.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2005 (completed)
  2. Withdrawn / abandonedSep 2006 (project stopped here)
  3. ConsentedSep 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G537
Grid region
MISO (Midcontinent)
Connection point (POI)
Watseka - Goodland 138 kV
Location
Iroquois County, Illinois
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
Feasibility
Queue status
Withdrawn
Entered queue
23 July 2005
Agreement signed
29 September 2006
Proposed online date
October 2006
Withdrawn
September 2006

Location

Marker shows the centre of Iroquois County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Iroquois County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem