United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

SOLAR Β· SPP

Solar project GEN-2017-070, Caddo Parish County

Solar project GEN-2017-070, Caddo Parish County is a 52.2 MW solar request withdrawn in the SPP interconnection queue, in Caddo Parish County, Louisiana, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2017 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2017-070
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Port Robson 138kV sub
Location
Caddo Parish County, Louisiana
Technology
Solar: 52.2 MW
Total requested
52.2 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
28 May 2017
Proposed online date
December 2019
Withdrawn
January 2019

Location

Marker shows the centre of Caddo Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Caddo Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem