United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J1912, Sanilac County
Solar project J1912, Sanilac County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Sanilac County, Michigan, connecting to ITC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1912
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC
- Connection point (POI)
- Greenwood-Rapson 345kV Transmission Line
- Location
- Sanilac County, Michigan
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 3; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 22 August 2021
- Proposed online date
- November 2023
- Withdrawn
- September 2023
Location
Marker shows the centre of Sanilac County; the queue data does not give exact sites.
Other requests in Sanilac County
- Onshore wind project J1557, Sanilac CountyOnshore wind Β· 293 MW Β· agreement signed
- Solar project J1196, Sanilac CountySolar Β· 200 MW Β· agreement signed
- Battery storage project J3977, Sanilac CountyBattery storage Β· 250 MW Β· in study
- Onshore wind project J3496, Sanilac CountyOnshore wind Β· 220 MW Β· in study
- Deckerville Solar Park ProjectSolar Β· 213 MW Β· in study
- Solar project J2878, Sanilac CountySolar Β· 200 MW Β· in study
- Solar project J3286, Sanilac CountySolar Β· 200 MW Β· in study
- Solar project J2374, Sanilac CountySolar Β· 200 MW Β· in study
- Solar project J3633, Sanilac CountySolar Β· 200 MW Β· in study
- Solar project J2667, Sanilac CountySolar Β· 200 MW Β· in study
- Solar project J1944, Sanilac CountySolar Β· 185 MW Β· in study
- Onshore wind project J308, Sanilac CountyOnshore wind Β· 301 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem