United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
BATTERY STORAGE Β· PJMBattery storage project AH1-632, Franklin County
Battery storage project AH1-632, Franklin County is a 12.0 MW battery storage request withdrawn in the PJM interconnection queue, in Franklin County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-632
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Mercersburg-Milnor 34.5 kV III
- Location
- Franklin County, Pennsylvania
- Technology
- Battery: 12.0 MW
- Total requested
- 12.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 10 September 2021
- Proposed online date
- September 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Franklin County
- FR-WilliamsportSolar Β· 20.0 MW Β· agreement signed
- Solar project AH2-405, Franklin CountySolar Β· 100 MW Β· in study
- Solar project AI2-019, Franklin CountySolar Β· 5.0 MW Β· in study
- Beaver Creek SolarSolar Β· 80.3 MW Β· suspended
- Great Cove Solar IISolar Β· 150 MW Β· built
- Aspen Road SolarSolar Β· 100 MW Β· built
- Gas project E04_W20, Franklin CountyGas Β· 88.0 MW Β· built
- Orchard Park Generating StationOther Β· 23.3 MW Β· built
- St. Thomas Township Solar Facility IISolar Β· 20.0 MW Β· built
- Solar project AD1-061, Franklin CountySolar Β· 20.0 MW Β· built
- St. Thomas Township Solar FacilitySolar Β· 20.0 MW Β· built
- Blairs ValleySolar Β· 20.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem