United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

SOLAR Β· NYISO

Great Valley Solar

Great Valley Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in Washington County, New York, connecting to NM-NG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2016 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
534
Grid region
NYISO (New York)
Utility / transmission owner
NM-NG
Developer
OneEnergy Development, LLC
Connection point (POI)
Battenkill 34.5kV Substation
Location
Washington County, New York
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
3 February 2016
Withdrawn
July 2019

Location

Marker shows the centre of Washington County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Washington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem