Astoria Repowering-Phase 2

Astoria Repowering-Phase 2 is a 173 MW gas request withdrawn in the NYISO interconnection queue, in Queens County, New York, connecting to CONED.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2000 (completed)
  2. Withdrawn / abandonedAug 2006 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
70
Grid region
NYISO (New York)
Utility / transmission owner
CONED
Developer
Reliant Energy
Connection point (POI)
Astoria 138kV
Location
Queens County, New York
Technology
Gas: 173 MW
Total requested
173 MW
Queue status
Withdrawn
Entered queue
18 August 2000
Withdrawn
August 2006

Location

Marker shows the centre of Queens County; the queue data does not give exact sites.