United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project 18, Lincoln County

Onshore wind project 18, Lincoln County is a 15.0 MW onshore wind request withdrawn in the West interconnection queue, in Lincoln County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2009 (completed)
  2. Withdrawn / abandonedAug 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Devils Gap-Lind 115 kV
Location
Lincoln County, Washington
Technology
Wind: 15.0 MW
Total requested
15.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
17 April 2009
Proposed online date
December 2011
Withdrawn
August 2009

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem