ONSHORE WIND Β· MISOOnshore wind project J579, Allegan County
Onshore wind project J579, Allegan County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Allegan County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedJan 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J579
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Argenta 345kV Substation
- Location
- Allegan County, Michigan
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- October 2018
- Withdrawn
- January 2019
Location
Marker shows the centre of Allegan County; the queue data does not give exact sites.
Other requests in Allegan County
- Battery storage project J4167, Allegan CountyBattery storage Β· 250 MW Β· in study
- Battery storage project J2889, Allegan CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J3480, Allegan CountyBattery storage Β· 200 MW Β· in study
- Solar + storage project J2786, Allegan CountySolar + storage Β· 170 MW Β· in study
- Onshore wind project J631, Allegan CountyOnshore wind Β· 200 MW Β· withdrawn
- Battery storage project J3817, Allegan CountyBattery storage Β· 175 MW Β· withdrawn
- Solar project J3474, Allegan CountySolar Β· 128 MW Β· withdrawn
- Onshore wind project G647, Allegan CountyOnshore wind Β· 102 MW Β· withdrawn
- Onshore wind project J576, Allegan CountyOnshore wind Β· 100 MW Β· withdrawn
- Onshore wind project J059, Allegan CountyOnshore wind Β· 99.0 MW Β· withdrawn
- Onshore wind project H076, Allegan CountyOnshore wind Β· 74.0 MW Β· withdrawn
- Onshore wind project J037, Allegan CountyOnshore wind Β· 64.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem