COAL Β· WEST

Coal project GI-0402, Grant County

Coal project GI-0402, Grant County is a 200 MW coal request withdrawn in the West interconnection queue, in Grant County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2004 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-0402
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Bigstone 230kV
Location
Grant County, South Dakota
Technology
Coal: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
IAP
Queue status
Withdrawn
Entered queue
7 April 2004
Proposed online date
April 2013

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Grant County