SOLAR Β· NYISOGedney Hill Solar
Gedney Hill Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in Albany County, New York, connecting to CHG&E.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 779
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHG&E
- Developer
- Hecate Energy Gedney Hill LLC
- Connection point (POI)
- New Baltimore - Westerlo 69kV
- Location
- Albany County, New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 9 November 2018
Location
Marker shows the centre of Albany County; the queue data does not give exact sites.
Other requests in Albany County
- Elevate BethlehemBattery storage Β· 120 MW Β· in study
- Bethlehem Energy CenterGas Β· 350 MW Β· built
- Bethlehem Energy CenterGas Β· 350 MW Β· built
- Bethlehem Energy Center UprateGas Β· 72.0 MW Β· built
- Bethlehem Energy Center UprateGas Β· 72.0 MW Β· built
- Albany County 2Solar Β· 20.0 MW Β· built
- Albany County 1Solar Β· 20.0 MW Β· built
- Albany County 2Solar Β· 20.0 MW Β· built
- Albany County 1Solar Β· 20.0 MW Β· built
- Albany LandfillOther Β· 6.4 MW Β· built
- Albany LandfillOther Β· 6.4 MW Β· built
- MM Albany LandfillOther Β· 4.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem