United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

BATTERY STORAGE Β· MISO

Battery storage project J1517, Vermillion County

Battery storage project J1517, Vermillion County is a 40.0 MW battery storage request withdrawn in the MISO interconnection queue, in Vermillion County, Indiana, connecting to DUKE ENERGY INDIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2020 (completed)
  2. Withdrawn / abandonedJul 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1517
Grid region
MISO (Midcontinent)
Utility / transmission owner
DUKE ENERGY INDIANA
Connection point (POI)
Hillsdale North 230 kV
Location
Vermillion County, Indiana
Technology
Battery: 40.0 MW
Total requested
40.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA In Process; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
18 June 2020
Proposed online date
October 2023
Withdrawn
July 2023

Location

Marker shows the centre of Vermillion County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Vermillion County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem