Interconnection queue in West Virginia (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown93,008 MW
Active in queue3,008 MW9 requests
Agreement signed0.0 MW0 requests
Withdrawn6731 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project AG2-582, Doddridge County
Gas Β· CPV Shay, LLC
2,100 MWIn study Doddridge, WVPJM Feb 2025target 2026
Mount Storm Repower
Onshore wind Β· Renew Development Holdco LLC
171 MWIn study Barbour, WVPJM Jan 2025target 2025
CPV Capon Springs Wind
Onshore wind Β· CPV Springs Wind, LLC
150 MWIn study Hampshire, WVPJM Jan 2025target 2025
Onshore wind project AG2-062, Grant County
Onshore wind Β· Catamount Wind LLC
147 MWIn study Grant, WVPJM Feb 2025target 2022
Solar project AH1-188, Mingo County
Solar Β· Twisted Gun Solar, LLC
140 MWIn study Mingo, WVPJM Feb 2025target 2025
Solar project AG2-657, Fayette County
Solar Β· Mammoth Solar, LLC
90.0 MWIn study Fayette, WVPJM Feb 2025target 2024
Solar project AG2-423, Barbour County
Solar Β· Falling Waters Solar, LLC
80.0 MWIn study Barbour, WVPJM Jan 2025target 2024
Solar project AG2-568
Solar Β· Sundial Energy, LLC
80.0 MWIn study WVPJM Feb 2025target 2024
Solar project AG2-448, Mineral County
Solar Β· Potomac Hills Energy, LLC
50.0 MWIn study Mineral, WVPJM Feb 2025target 2024

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)