Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown71,328 MW
Active in queue1,328 MW7 requests
Agreement signed220 MW2 requests
Withdrawn151,569 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project G0558, Benton County
Onshore wind
500 MWIn study Benton, WAWest Feb 2017target 2019
Onshore wind project G0559, Benton County
Onshore wind
250 MWIn study Benton, WAWest Mar 2017target 2019
Gas project 54, Grays Harbor County
Gas
199 MWPaused / redesign Grays Harbor, WAWest Dec 2017target 2026
Solar + storage project 1, Grant County
Solar + storage
120 MWAgreement signed Grant, WAWest Sep 2017
Solar project 49, Kittitas County
Solar
100 MWAgreement signed Kittitas, WAWest Apr 2017target 2027
Solar project 953, Yakima County
Solar Β· High Top Solar LLC
80.0 MWPaused / redesign Yakima, WAWest Sep 2017target 2025
Solar project 51, Kittitas County
Solar
79.2 MWPaused / redesign Kittitas, WAWest Sep 2017target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)