United States βΊ Grid βΊ Interconnection queues βΊ Washington
OCTARY USA Β· INTERCONNECTION QUEUESOther interconnection queue in Washington
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Other project G1025, Douglas County Other |
1,274 MW | In study |
| Other project G1072, Lewis County Other |
667 MW | In study |
| Other project 110, Garfield County Other |
560 MW | In study |
| Other project G0924, Walla Walla County Other |
300 MW | In study |
| Other project G0925, Walla Walla County Other |
300 MW | In study |
| Other project G0923, Walla Walla County Other |
300 MW | In study |
| Other project 141, Thurston County Other |
300 MW | In study |
| Other project 6, Chelan County Other |
100 MW | In study |
| Other project 66, Stevens County Other |
71.0 MW | Agreement signed |
| Other project Q66, Stevens County Other |
71.0 MW | Agreement signed |
| Other project hist_q71, Stevens County Other |
4.5 MW | Paused / redesign |
| Other project 15, Skagit County Other |
0.8 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)