United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Utah (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown92,369 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn92,369 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Solar + storage project Q77, Millard County
Solar + storage Β· Intermountain Power Agency
640 MWWithdrawn / abandoned Millard, UTWest Apr 2020target 2023
Solar + storage project 1232, Iron County
Solar + storage
455 MWWithdrawn / abandoned Iron, UTWest May 2020target 2023
Solar + storage project 1225, Juab County
Solar + storage
350 MWWithdrawn / abandoned Juab, UTWest Apr 2020target 2023
Solar project 1202, San Juan County
Solar
300 MWWithdrawn / abandoned San Juan, UTWest Mar 2020target 2022
Solar + storage project 1224, San Juan County
Solar + storage
250 MWWithdrawn / abandoned San Juan, UTWest Apr 2020target 2023
Solar + storage project 1207, Carbon County
Solar + storage
150 MWWithdrawn / abandoned Carbon, UTWest Apr 2020target 2023
Solar project 1203, Iron County
Solar
120 MWWithdrawn / abandoned Iron, UTWest Mar 2020target 2022
Solar + storage project 1218, Beaver County
Solar + storage
100 MWWithdrawn / abandoned Beaver, UTWest Apr 2020target 2023
Wind + storage project 1216, Salt Lake County
Wind + storage
3.9 MWWithdrawn / abandoned Salt Lake, UTWest Apr 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)