United States βΊ Grid βΊ Interconnection queues βΊ Utah
SOLAR + STORAGE Β· WESTSolar + storage project Q77, Millard County
Solar + storage project Q77, Millard County is a 640 MW solar + storage request withdrawn in the West interconnection queue, in Millard County, Utah, connecting to Los Angeles Department of Water and Power.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Q77
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Los Angeles Department of Water and Power
- Developer
- Intermountain Power Agency
- Connection point (POI)
- IPP 345kV Switchyard
- Location
- Millard County, Utah
- Technology
- Solar: 400 MW Β· Battery: 240 MW
- Total requested
- 640 MW
- Queue status
- Withdrawn
- Entered queue
- 13 April 2020
- Proposed online date
- June 2023
Location
Marker shows the centre of Millard County; the queue data does not give exact sites.
Other requests in Millard County
- Solar + storage project Q105, Millard CountySolar + storage Β· 1,200 MW Β· in study
- Solar + storage project Q93, Millard CountySolar + storage Β· 1,000 MW Β· in study
- Solar + storage project Q51, Millard CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project Q90, Millard CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project Q104, Millard CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project Q50, Millard CountySolar + storage Β· 800 MW Β· in study
- Solar + storage project Q94, Millard CountySolar + storage Β· 700 MW Β· in study
- Solar + storage project Q49, Millard CountySolar + storage Β· 600 MW Β· in study
- Solar + storage project Q53, Millard CountySolar + storage Β· 570 MW Β· in study
- Solar + storage project Q52, Millard CountySolar + storage Β· 518 MW Β· in study
- Solar + storage project C3-036, Millard CountySolar + storage Β· 500 MW Β· in study
- Solar + storage project Q44, Millard CountySolar + storage Β· 450 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem