Solar + storage project Q77, Millard County

Solar + storage project Q77, Millard County is a 640 MW solar + storage request withdrawn in the West interconnection queue, in Millard County, Utah, connecting to Los Angeles Department of Water and Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q77
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Developer
Intermountain Power Agency
Connection point (POI)
IPP 345kV Switchyard
Location
Millard County, Utah
Technology
Solar: 400 MW Β· Battery: 240 MW
Total requested
640 MW
Queue status
Withdrawn
Entered queue
13 April 2020
Proposed online date
June 2023

Location

Marker shows the centre of Millard County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Millard County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem