United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Texas (2017 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown162,714 MW
Active in queue7,091 MW42 requests
Agreement signed4,377 MW26 requests
Withdrawn7413.5 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

16 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Tehuacana Wind
Onshore wind
600 MWPaused / redesign Limestone, TXERCOT Jun 2017
Horseshoe Bend Solar
Solar Β· Clenera
301 MWIn study Brown, TXERCOT Jun 2017target 2027
Kontiki 2 Wind (ERNEST)
Onshore wind
250 MWPaused / redesign Glasscock, TXERCOT Jun 2017
Kontiki 1 Wind (ERIK)
Onshore wind
250 MWPaused / redesign Glasscock, TXERCOT Jun 2017
Lutum Wind
Onshore wind Β· RWE
242 MWIn study Clay, TXERCOT Sep 2017target 2027
Giddings Wind
Onshore wind Β· Pioneer Natural Resources
240 MWIn study Upton, TXERCOT Sep 2017target 2030
Anson Solar Center, Phase III
Solar Β· Anson Solar Center 3, LLC
200 MWIn study Jones, TXERCOT Jun 2017target 2027
Bestla Solar
Solar
180 MWPaused / redesign Winkler, TXERCOT Jan 2017
Angus Solar
Solar Β· Angus Solar, LLC
113 MWPaused / redesign Bosque, TXERCOT Nov 2017target 2026
San Bernard Solar
Solar Β· Sunchase Power
100 MWPaused / redesign Wharton, TXERCOT Jan 2017target 2022
Angus Storage
Battery storage
63.0 MWPaused / redesign Bosque, TXERCOT Nov 2017
Agate Solar
Solar
60.0 MWPaused / redesign Ellis, TXERCOT Aug 2017
Lueders Solar
Solar Β· Innovative Solar 75
40.0 MWIn study Haskell, TXERCOT Jul 2017target 2028
Spinel Solar
Solar
30.0 MWPaused / redesign Medina, TXERCOT Aug 2017
Fluorite Solar
Solar
25.0 MWPaused / redesign Uvalde, TXERCOT Aug 2017
Basalt Solar
Solar
20.0 MWPaused / redesign Uvalde, TXERCOT Jul 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)