United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in Texas (2015 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown92,094 MW
Active in queue3,201 MW14 requests
Agreement signed1,107 MW5 requests
Withdrawn246,944 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Eagle Pines Gas
Gas Β· FGE Power
1,174 MWIn study Cherokee, TXERCOT Mar 2015target 2028
Morada Del Sol Solar
Solar Β· First Solar
245 MWPaused / redesign Upton, TXERCOT Mar 2015target 2020
Grandview 4 Phase A Wind
Onshore wind
201 MWPaused / redesign Carson, TXERCOT Nov 2015
Whatley Solar
Solar Β· Invenergy
150 MWPaused / redesign Andrews, TXERCOT May 2015target 2020
Wake Solar
Solar Β· Invenergy
150 MWPaused / redesign Crosby, TXERCOT Jul 2015target 2021
Owego Solar
Solar Β· Hecate Energy
74.0 MWPaused / redesign Pecos, TXERCOT Apr 2015target 2020
Chatee Solar
Solar Β· Hecate Energy
57.0 MWPaused / redesign Pecos, TXERCOT Apr 2015target 2020
Hecate Solar
Solar Β· Hecate Energy
33.0 MWPaused / redesign Brewster, TXERCOT Mar 2015target 2020
Mirage
Gas
11.0 MWPaused / redesign Harris, TXERCOT Feb 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)